Upstream Oil & Gas

Baku-Tbilisi-Ceyhan Pipeline

CB&I performed a number of contracts for the engineering, procurement and management assistance of a 1,760 kilometer (1,094 mile), 42 in./46 in. oil export pipeline from Baku, Azerbaijan to Ceyhan, Turkey, via Tbilisi, Georgia.

Boabab FPSO Topsides

CB&I completed the detailed engineering and procurement services for the topsides process and utility modules for the Boabab FPSO Topsides project.

Buzzard Enhancement Platform

CB&I performed the Buzzard Enhancement Platform project for Nexen Petroleum in the Central North Sea, off the coast of the United Kingdom.

Buzzard Offshore Platform Topsides

The Buzzard field development, operated by Nexen Petroleum U.K. Ltd. and its partners, is one of the largest North Sea crude oil projects in more than a decade.

Goliat FPSO

Hyundai Heavy Industries contracted CB&I to perform the early detailed engineering phase (to AFD status) and provide technical input for the Goliat FPSO project.

Greater Ekofisk Area 2/4L FEED

CB&I was contracted by Aker Solutions and ConocoPhillips to perform the FEED on the new Offshore Utilities & Accommodation Facility topsides.

Hoegh LNG Floating LNG FPSO

After successfully completing the pre-FEED study, CB&I was awarded the FEED contract for the topside facilities for an LNG FPSO.

Kashagan Full Field Development FEED

Agip KCO (Agip Kazakhstan North Caspian Operating Company) contracted K-WAC, a joint venture between Worley Parsons, Aker Kvaerner, and CB&I, to perform the FEED on the Kashagan Full Field Development Project.

Kizomba A Tension Leg Platform

ExxonMobil awarded the contract for the Kizomba A Tension Leg Platform (TLP) to CB&I.

Magnolia Tension Leg Platform

Conoco awarded CB&I a contract to perform the engineering, procurement and construction management for a complete Floating Production System

Molikpaq Oil Treatment & Gas Disposition Modules

Sakhalin Energy Investment Company contracted with CB&I to upgrade the Molikpaq platform in Russia.

Neftegas Sakhalin 1Field Development

CB&I was contracted by Exxon Neftegas Ltd. to perform FEED and subsequently EPCm for the Sakhalin I Field Development project.

Skarv-Idun FPSO

Aker Kvaerner Engineering and Technology (AKET) and BP Norge contracted CB&I to perform the FEED and detailed design for parts of the topsides of the Skarv-Idun FPSO.

South Caucasus Pipeline

CB&I was awarded the FEED, detailed engineering and procurement services for the 42 in., 700 kilometer gas export pipeline from Sangachal, Azerbaijan – south of Baku – to the Turkish border by BP Caspian Ltd.

Tupi-1 FPSO (Cidade de Angra dos Reis MV-22)

CB&I was awarded a contract for the conceptual design and detailed engineering services for the FPSO topsides for the Tupi Pilot project.

Tupi-3 Guara FPSO (Cidade de Sao Paulo MV-23)

MODEC awarded the engineering work for a new FPSO to CB&I on behalf of the owner, Petrobras.

Khuff Gas Development Platform

CB&I was awarded the EPC, commissioning and start-up contract for the Khuff Gas Development Platforms by ADMA-OPCO, a subsidiary of ADNOC.

Aasta Hansteen Spar Topside

Statoil Petroleum AS contracted CB&I for Front End Engineering and Design work for the Aasta Hansteen Topside project.

Downstream Oil & Gas

Valero Energy Diesel Hydrotreater

Valero Energy selected CB&I to design and build a 16,000 barrel per stream day (BPSD) UOP ultra low sulfur diesel hydrotreater at its refinery in Benicia, California.

Valero St. Charles Diesel Processing Facility

Valero Energy selected CB&I to provide the engineering, procurement, and construction of several process units for an Ultra Low Diesel Processing Facility at its St. Charles, Louisiana refinery.

Yemen LNG Cryogenic Gas Plant

CB&I was awarded a lump-sum contract to provide a 420 million standard cubic feet per day (SCFD) gas processing and treating complex in Marib, Yemen for Yemen LNG Company Ltd. (YLNG).

QAFCO Ammonia Storage Tanks

CB&I was awarded a lump sum turnkey contract by Snamprogetti to design and build two refrigerated ammonia storage tanks for the Qatar Fertilizer Company (QAFCO) 5 ammonia and urea expansion project in Mesaieed, Qatar.

Pearl GTL Storage Facility

Shell selected CB&I to design and build a storage facility for the Pearl Gas-to-Liquids (GTL) production complex in Ras Laffan, Qatar.

GASCO LPG Storage Tanks

CB&I was awarded a lump-sum turnkey contract for liquefied petroleum gas (LPG) storage tanks for a natural gas processing expansion project in Ruwais, Abu Dhabi, United Arab Emirates.

Singapore Olefins Plant Project

As Singapore's chemical industry continues to grow, Jurong Island is a hotbed of project activity.

BP Refinery Coke Drums

When BP needed to replace damaged coke drums at its Carson, California, refinery, CB&I responded with a new and innovative solution.

Baton Rouge FCC Unit Turnaround

The Baton Rouge Fluid Catalytic Cracking (FCC) Unit Turnaround consisted of two separate FCC turnarounds that were completed within schedule and within budget.

MTBE and TAME Plants

The Methyl Tertiary-Butyl Ether (MTBE) and Tertiary Amyl Methyl Ether (TAME) plants in Killingholme, United Kingdom, include offsite and storage facilities for propane, propylene and methanol for Lindsey Oil Refinery Ltd.

Argentina Propane/Butane Export Terminal

The Argentina propane/butane export terminal was a turnkey design and construction project for Transportadora de Gas del Sur that provided a terminal for the economical export of refrigerated liquid propane and butane by ship.

Petrochemical Storage and Process Vessels

J.G. Summit Petrochemical Corp. selected CB&I to design and build cryogenic and atmospheric storage vessels for a petrochemical complex in Simlong, Batangas City, Philippines.

North Bontang, Indonesia Ammonia Export Terminal

The Indonesia ammonia export terminal in North Bontang was a turnkey engineering, procurement, and construction project for P.T. Kaltim Pasifik Amoniak.

BP Chemicals Absorber Vessel

CB&I was contracted by BP Chemicals to design and install an MAH reactor vessel and an absorber vessel.

El Segundo Fluid Catalytic Cracking Process Unit Upgrade

The El Segundo, California turnaround project was conceived by Chevron Products Company to increase the output of gasoline from their El Segundo refinery.

Shell Haven - Naphtha Minus Complex (NMC)

The Naphtha Minus Complex project was a "fast track" engineering, procurement and construction project that was added to the Shell Haven refinery to enhance its ability to produce unleaded gasoline.

LNG

Woodside LNG Phase V Project

CB&I was awarded a contract from Woodside Energy Limited for the North West Shelf Venture onshore gas plant near Karratha, Western Australia.

Woodside LNG Tanks

Woodside Burrup Pty. Ltd. selected CB&I to produce liquefied natural gas (LNG) storage tanks in the Burrup Peninsula near Karratha, Australia

Southern LNG Terminal Expansion

Southern LNG awarded CB&I a lump-sum turnkey contract to expand its Elba Island liquefied natural gas (LNG) import terminal near Savannah, Georgia, USA.

Southern LNG Expansion Project Phase IIIA

Southern LNG awarded CB&I with a lump sum turnkey contract to further expand the Elba Island LNG import terminal near Savannah, Georgia, USA.

South Hook LNG Import Terminal

CB&I was awarded a contract to design and construct a grassroots liquefied natural gas (LNG) import terminal in Milford Haven, Wales, U.K. on a lump-sum basis.

GNL Quintero LNG Regasification Terminal

GNL Quintero S.A. awarded CB&I with a lump-sum contract for engineering, procurement and construction (EPC) of a liquefied natural gas (LNG) regasification terminal at Quintero Bay, Chile.

Cove Point LNG Import Terminal Expansion

CB&I was awarded a lump-sum turnkey contract for a liquefied natural gas (LNG) terminal expansion project located near Lusby, Maryland. 

Chiyotec Limited / CTSD Limited LNG Storage Tanks

Chiyotec Limited / CTSD Limited selected CB&I to provide the engineering, procurement and construction for the first two LNG storage tanks designed and constructed in Russia.

LNG Peakshaving Facility, Connecticut, USA

In October 2004, CB&I was awarded a lump-sum turnkey contract for a liquefied natural gas (LNG) peak shaving project in Waterbury, Connecticut.

Fujian LNG Terminal & Trunkline

In December 2005, CB&I was awarded a lump-sum turnkey contract for the design and construction of terminal system works at a new liquefied natural gas (LNG) import terminal in Fujian Province, Peoples Republic of China.

PERU LNG Export Terminal

The PERU LNG Export Project is not only the largest industrial project ever to be undertaken in Peru, but it is also South America's first base load LNG export facility.

AES LNG Import Terminal

AES Corporation selected CB&I to design and build the Dominican Republic's first LNG import terminal.

Memphis LNG Peak Shaving Facility

The Memphis LNG peak shaving facility in Tennessee was a turnkey design, supply, construction and commissioning project that reduced the need for expensive pipeline transportation costs.

Nuclear

V.C. Summer Nuclear Station, Units 2 and 3

CB&I and Westinghouse are building two AP1000® nuclear electric-generating units at the V.C. Summer Nuclear Station, near Jenkinsville, S.C.

Vogtle Electric Generating Plant, Units 3 and 4

In 2008, construction at Vogtle Electric Generating Plant began for two new nuclear power units and related facilities using the Westinghouse AP1000® technology for our customer, Georgia Power Co., a subsidiary of Southern Company.

China AP1000® Nuclear Power Plants

CB&I, along with Westinghouse, is building four new nuclear power plants for the People's Republic of China State Nuclear Power Technology Company (SNPTC) using Westinghouse's AP1000 passive Generation III+ technology.

Georgia Power Nuclear Containment Vessels

CB&I has been awarded a contract by Westinghouse Electric Company for two nuclear containment vessels for Georgia Power in Waynesboro, Georgia.

Clean Coal & Gas

Currant Creek Gas-Fired Power Plant

In three years, CB&I built the Currant Creek Gas-Fired Power Plant, named one of the Top Plants by POWER Magazine in 2006.

Astoria Power Plant

CB&I’s major projects involve advanced gas turbine technology and innovative use of modularization, as seen in our work at the Astoria Power Plant.

Virginia City Hybrid Energy Center

CB&I provided design and EPC services for Dominion Virginia Power's new, 585-MW clean coal-fired generating plant and achieved substantial completion in July 2012.

Brunner Island Retrofit Project

Featured as one of POWER magazine's top plants in October 2010, PPL Brunner Island features pollution control upgrades through flue gas desulfurization (FGD) systems installed by CB&I.

Hydroelectric

Gauley River Penstock

The Gauley River in Summersville, West Virginia, is one of the best rivers in North America for whitewater rafting.

Water & Wastewater

Ripon, California Hydropillar®

CB&I was awarded a contract with the City of Ripon, California to design, fabricate, construct and coat  a 2.5 million gallon Hydropillar® located in the middle of the City’s new Mistlin Sports Complex.

PUL Alliance Waterspheroid®

PUL Alliance selected CB&I to provide a 500,000 gallon Waterspheroid® elevated tank in Blue Springs, Mississippi.

Jonesboro City Water and Light Standpipe

Jonesboro City Water and Light selected CB&I to provide a steel standpipe in Jonesboro, Arkansas

City of Spokane ESD™

The City of Spokane, Washington, selected CB&I to provide two ESD™ egg-shaped digesters.

City of Piperton Waterspheroid®

The City of Piperton, Tennessee, selected CB&I to provide a Waterspheroid® elevated tank.

City of Darien Standpipe

The City of Darien, Illinois, selected CB&I to provide a steel standpipe.

Charter Township of Northville Waterspheroid®

The Charter Township of Northville chose CB&I to build an elevated steel tank in Northville, Michigan. CB&I was responsible for the engineering, fabrication and construction of the tank.

Hyperion Egg-Shaped Digesters (ESD™)

The installation of egg-shaped digesters (ESD™) at this California water treatment plant increased treatment capacity while conserving space.

World’s Largest ClariCone®

The installation of ClariCones provided the Albany Water, Gas and Light Commission with a cost-effective way to lower turbidity in the city's water.

Westminster Reservoirs

After the failure of a 5-million-gallon concrete water reservoir, the City of Westminster, California, retained CB&I to build two new all-welded-steel reservoirs.

Jefferson County Hydropillar®

When Jefferson County, Alabama, needed a major expansion of its wastewater flow, officials contracted CB&I to build a 3-million-gallon Hydropillar complete with a treatment laboratory and office facility.

Metals & Mining

Alumina Refinery Expansion

Design and construction of plant expansion

Nickel Process Plant

Design and construction of process and storage tanks

Nickel Process Plant

Design and construction of process and storage tanks

Alumina Plant Expansion

Design and construction of plant expansion

Lihir Gold Plant Optimization

Turnkey construction of plant upgrade

Alumina Plant Upgrade/Expansion

Design and construction of plant expansion

Nickel-Cobalt Process Plant

Design and construction of ore processing plant

Lihir Gold Refining Plant

Design, fabrication and construction of gold treatment plant

Alumina Refinery Expansion

Design and construction of alumina storage silos

Alumina Storage Facility

Design and construction of alumina storage silos

Federal

Formerly Utilized Sites Remedial Action Program (FUSRAP)

CB&I is providing environmental remediation services for three FUSRAP projects and has completed five other projects in the past 10 years.

Hurricanes Katrina and Rita

As a recognized leader in emergency response and recovery services, CB&I assisted at a moment’s notice following hurricanes Katrina and Rita, which hit Louisiana in 2005.

Inner Harbor Navigation Canal (IHNC) Surge Barrier Project

CB&I designed and is constructing a surge barrier wall to provide hurricane-level protection for the greater New Orleans area. It is the largest design-build project ever awarded by the U.S. Army Corps of Engineers.

Mixed Oxide Fuel Fabrication Facility

Shaw AREVA MOX Services, LLC is designing and constructing this first-of-a-kind facility at the U.S. Department of Energy's Savannah River Site in an important nonproliferation project.

Fort Benning Base Operations Support

CB&I is providing public works services at one the largest and busiest U.S. Army bases.

Andersen Air Force Base

Along a steep cliff overlooking the Philippine Sea, CB&I completed a challenging environmental remediation project.

State & Local

Yankee Stadium Station

As engineer of record, CB&I played an essential role in getting the signature Yankee Stadium Station up and running, meeting project requirements while faced with the challenges of heavy railway traffic.

Louisiana Fisheries Research Lab

CB&I served as construction manager for the Louisiana Department of Wildlife and Fisheries' state-of-the-art Fisheries Research Lab in Grand Isle, La., which opened in 2009.

Croton Water Filtration Plant

CB&I’s engineering and construction services are supporting the New York City Department of Environmental Protection's long-term plan to create the first environmentally sustainable 21st century city.