CB&I
Previous Page Next Page
 
 
Financial Highlights Letter to Shareholders At A Glance Worldwide Projects CB&I Leadership CB&I Facilities Corporate and Investor Info
   
 
  LNG Import Terminal Expansion
LNG Import Terminal
Hydrotreater
North Sea Platform
Mineral Processing Plant
Hydrogen Plant
Ammonia Storage Facility
Floating Casino Vessel
Waste Water Treatment Plant
The Buzzard field development, operated by Nexen Petroleum U.K. Limited and its co-venturers, is one of the largest North Sea crude oil projects in more than a decade and is scheduled to begin producing in late 2006. CB&I is responsible for the engineering design of the three platform topsides facilities: the production, utilities and wellhead decks, with a total weight of approximately 25,000 tonnes. Pictured is the production deck, weighing more than 10,000 tonnes, loaded out and ready to set sail from the fabrication yard in Spain where it was built.